top of page
Nature Nurture
Plumb Point, Deer Isle
A point with eroding and undermined banks on both sides.
PLAN: Using Living Shoreline techniques, secure the bank with anchored logs, heavy coir fabric rolls, sandbags filled with stump grindings and gravel. All work was done by hand to secure the first phase fall 2019. Finish building and vegetate with woody and herbaceous species spring 2020.
bottom of page